In the UNIFORMAT guideline what type of contract is assumed?
The UNIFORMAT guidance says that design development ends with approval by the owner of the plans, projected cost, and schedule
This seem strange as i have always worked on projects that agree the costs/schedule in the feasibility stage, prioir to any design development.
Does UNIFORMAT assume a General Contracting contract type, where the design is done by someone other than the designers?
There is also no WBS, only ativity code.
To enable you to become versatile planning engineer, you should always go first to WBS, Work Breakdown Structure. The approach is always to work out first the WBS since WBS will give you a logical way of decomposition/decomposing the overall scope of work.
The activity codes is also very important (IT GIVE YOU FLEXIBILITY) because it will group related activities that the WBS find hard to do considering that the WBS is very rigid.
A word of advise, never use Activity Code as WBS. Activity Code and WBS have their own purposes. And, they are complementary and supplementary.
Hi Hany,
it is cute, resource loaded, cost loaded
no quantities to check productivity rate for resource assignment
Start date: 15 Nov 06
Finish date: 15 Jan 08
Data Date: 15 Nov 06
However revision box: 19 May 07 Rev 00, 02 Jun 07 Rev 01
If you use start date 15 Nov 06 equal to your data date 15 Nov 06, then this is for 1st baseline submiision for approval.
But there is already a lot of updates and revision, so this particular schedule is a revision of the baseline program
In this case, the data date should be the latest revision date 02 Jun 07 and....
It should capture the actuals progress to date. In this way, the revise program will give a true picture of where the project now and where it will be heading.
The first question is??? will it attain the finish date on 15 Jan 08????
Sensei
Successful Project Management Consultant
COULD YOU PLEASE SEND ME A COPY OF MASTERFORMAT TO MY EMAIL AT YOUR CONVINIENCE
[email protected]
Sajid,
Would you please send a copy of Masterformat to my E Mail.
[email protected]
Thanks,
S.Syed Musthafa
Hi Sajid,
Copy recieved. Many Thanks!
Gerry
Hello Sajid,
Can you also please share to me a copy of the Masterformat? Ill be glad to have one. Thanks.
Best Regards,
gerry
[email protected]
COULD YOU PLEASE SEND ME A COPY OF MASTERFORMAT TO MY EMAIL
[email protected]
thnx
drop me a line on [email protected] and I will send you pdf file of Masterformat 2004
Sajid,
Will u plz share with us Masterformat. Uniformat was good but seems masterformat will be better than omniclass or uniformat. Will u plz upload it.
Cheers,
Ravi
Dears
A quick input on Uniformat II & Masterformat
Masterformat tells you WHAT is involved in a construction project while Uniformat tells you WHERE it is involved.
For example
021-Slab on Grade (Unfiformat II classification tells you that it is belong to Substructure. Now if you go to Masterformat it tells you that it should carry the following elements (activities) to complete.
03 30 00 Cast-in-Place Concrete
includes aggregate, cement, and additives.
May Include
concrete forming, accessories, and reinforcing.
granular subbase and vapor retarders for concrete slabs-ongrade
Thank you Ahmet
Regards from Germany
Dieter
Ahmet,
That was superb.
Thanx for sharing:-)
Hi Ahmet
Sorry to jump on the waggon. Up to now I heard of Uniformat II, but I never got a real explanation.
Do you have any reference?
Thank you very much
Dieter