Ifeanyi Olike;
P3e an P5 are not the same and there is no P3e ver 5.
The correct name is Primavera 5.0 (official name informed by Primavera Systems) an P5 is an abbreviation for Primavera 5.0.
P3e is an abbreviation for Primavera Project Planner for the Enterprise and its last varsion was 4.1. There is no P3e any more.
Regards.
P3e/P3ec came first as ver 4/4.1 then P3e ver5. All of them are the same but some country they call it differenly and not by version.
Rodel,
I thought P3e and P5 are the same. Or are they different?
Yap! I been using this since and now upgraded to P5 and its working fine.
Rodel,
is undo REALLY available since P3e? I had in mind that it had come only with P5
Alexandre
Undo command is only available in P3e or P5. If you havent save, schedule, or press F5 to save your changes you can undo it by pressing Ctrl "Z" up to the last changes.
Hi,
there is NO undo command in P3!