Hi achim,
Forgotten me
Thanks Jaco it worked. Regards from Munich Achim
Hi Achim
I WOuld Suggest you go to the Following Method.
1) Open a P3 Schedule (in Hours)
2) Create the 20 Systems as Activity
3) Calcultate the activity Durations
Example assume System has 80 loops and you said 40 loops a Day (Assume 8 working hours) This mean activty duration is 16 hrs
Do the system Inter Logic
Assign a Resource "Loops" BQ (Number of loops / Systems)
Press level (Assign the resource Loops) Make Normal & Max lvl 5 (40 loops /8 Hours)