Planning Engineer, North East Shipbuilders Ltd., (various projects)

START Date
END Date

Responsible for unit outfit work packages for all production areas. Modular pipe work systems were split into work package information to enable 50 tonne modules of pipe work to be assembled offsite and then be installed as a complete unit. Also 500 tonne accommodation units were work packaged in a similar manner and fabricated on the quayside and lifted upon the vessel as a complete finished unit. Work packaging of this nature was developed during the construction of the I.T.M. "Challenger" which is a 45,000 tonne Crane Ship - the largest of its type in the World.

Senior Planning Engineer, Matthew Hall M&E Engineers Ltd., (various projects)

START Date
END Date

Project: Head Office
Responsible for the development of Artemis 2000 and Artemis Project Planning Systems within the Planning Function. Preparation of Tender Programmes and Construction Programmes for Mechanical / Electrical / Instrumentation work packages for Oil-fired Power Stations, food processing plants, gas handling plants, oil refineries, nuclear power station, paper mills etc.

Construction Project Planner / Senior Planner, Redpath Engineering Services Ltd., (various projects)

START Date
END Date

Project: Shell Gannet Offshore Production Platform
Based at Redpath Offshore North, Port Clarence on the Shell Gannet Production Platform Project consisting of Integrated Deck Module, Accommodation Module, Drill Equipment Set Module and Flare boom. Heading a team of Electrical & Instrument Planning Engineer, Mechanical Planning Engineering, Assistant Planning Engineers, Technical Clerks and Data Input Clerks. Responsible for the coordination of the Electrical & Instrumentation with the Mechanical Disciplines and their associated Networks / Programmes / Reports.

Core Team Senior Planning Engineer, Roll Royce Nuclear Plant Services, (various projects)

START Date
END Date

Projects: Various
Based at Nuclear Engineering Services Head office and responsible for the preparation of Electrical / Mechanical & Instrumentation programmes of Networks / Schedules / Barcharts / Histograms & ‘S’ curves for the scheduling of Refurbishment and Outage / Shut-down Work within the Nuclear Power plants Industry using ARTEMIS 7000/SP7000 Planning Systems.
Also responsible for the progressing & updating of all projects status for senior management review, preparation & submission of Tender Programmes for work within the Nuclear Plants & Offshore Industr

Senior Planning Engineer, ICI Eutech Engineering Solutions Ltd., (various projects)

START Date
END Date

Projects: Control & Op’s of the Olefin’s Plant Re-Instrumentation Project JV06, Teesside.
Polymer Expansion Plant at Rosenberg
Responsible for the front-end installation plan for the Control & Operability of the Olefin’s Plant Re-Instrumentation Project JV06, consisting of an existing Hydro-cracker, Ethylene plant, Boilers and associated machinery.

Senior Planning / Commissioning Engineer, KBR, (various projects)

START Date
END Date

Position: Senior Planning / Commissioning Engineer
Company: Contracted to Kellogg Brown & Root (KBR) for Devonport Management Ltd.
Project: D154 Nuclear Submarine Refueling Facility, Plymouth, England
Responsible for the full integration of sub-contractor/alliance members programmes for the capability of Refueling Trident / Vanguard Class Nuclear Submarines for the Ministry of Defence.
Construction / Setting to Work / Commissioning of a purpose built Re-fuelling facility consisting of Primary Circuit Decontamination/Alternative Core Removal Cooling Building, Training Rigs, L

Senior Planning Engineer, BAE Systems, (various projects)

START Date
END Date

Company: Contracted to BAE Systems
Project: Type 45 ‘D’ Class Destroyers, Bristol, England.
Contract value approximately £1 billion.
Employed as a Senior Planner in the Prime Contractor Organisation (PCO), for the production of three new Type 45 ‘D’ Class Destroyers (Displacement c.7,350 tonnes, Length 152.4m, Max.Beam 21.2m, Speed 27 knots+).
Responsibility for a fully Integrated Level 3 Resourced Programme to support the Design of Combat systems consisting of: PAAMS, Multi-function Radar, Long Range Radar, Combat Management System, Navigation subsystem, Communications Suite, E

Senior Planning Engineer, Thales, CVF Aircraft Carrier Programme

START Date
END Date

Project: CVF Aircraft Carriers, Bristol, England.
Contract value approximately £3 billion.
Employed as a Senior Planning Engineer in the Prime Contractor Organisation (PCO), for the production of two new 50,000 tonne CVF Aircraft Carriers.
Responsible for a fully Integrated Level 3 Resourced Programme to support the procurement of services for Platform Design & Build, Power & Propulsion Systems, Electro Optical Target Indication, Infra-red Search & Alerting System, Command System, Radar Electronic Support, Measures, Close In Weapons System, Decoy Launching System, Long

Senior Planning Engineer, KBR, National Programme for Information Technology (NPfIT)

START Date
END Date

Project: National Programme for Information Technology (NPfIT), Leeds, England.
Contract value approximately £2.3 billion.
Responsible for the provision and implementation of Programme Control Systems and processes for the NPfIT Programme which consisted of: Integrated Care Records System, Electronic Booking System, Electronic Transmission of Prescriptions, Picture Archiving & Communications System, New National Networking Systems, Email & Directory Services, Design Authority, Stakeholder Liaison, and Cluster Implementation using Primavera 3.1 & Primavera P3e Planning Soft