Bid/Project Planning Engineer, Vinci Construction UK Ltd, A406 Hanger lane Bridge replacement project, Tender Planning

P
Pavan Kumar 👤 Member for 18 years 8 months
START Date

As a Planning Engineer for A406 Hangerlane Bridge project

Tender Planning - Energy Projects

Planning Engineer for London Bridge - Soil Engineering Project

Assistant Engineer, Mouchel Parkman, Highways & Transportation

START Date
END Date

Traffic Survey Manager and Assistant Engineer (up to £40m schemes).
Resident Site Engineer Urban Refurbishment Scheme, Mellyncryddan, Neath.
Computer Network Manager 1992 – 1997, Computer Support 1989 – 1992.
AutoCAD trainer, WordPerfect trainer, Lotus 123 and Quattro Pro trainer.
Quality Assurance (IT) Database Manager (Hardware & Software Registers).

Site Project Manager / Contract Negotiator / Integration Manager, EDS Consultants, UPKEEP and QMG Desktop & Server Rollouts and Infrastructure

START Date
END Date

·Part of the EDS Bid Management Team, and personally responsible for all five main sites with the Civil Engineering sub-contractor.

Project Manager, Orange, Infrastructure & Engineering

START Date
END Date

·Responsible for all Project Management Documentation and weekly/monthly and exception reporting for multiple projects (MS Project and INNATE).
·Responsible for Programme co-ordination and KPI reporting for Departmental Programme.
·Liaison and negotiation with Sponsors, Resource Managers and Software Developer / Analysts with respect to Graphical User Interface mapping tools software development.
·Production of all my projects Business Cases and presentation to Board, where necessary.
·Meeting with Clients/Vendors to define and agree Specifications and Business Requirements for

Freelance Senior Planner, Magnox Electric, Infrastructure & IT Refresh

START Date
END Date

·Creation and Control of Project & Programme Plans (MSP 2000 and Primavera P3e).
·Creation and Control of Issue and Risk Registers.
·Cost estimation and other Bid Pack preparation, EVA and Project Status Reporting.
·Organising and chairing Project and Quality meetings and Acting as Project Lead when required.
·Liaison with Project Leads, Technical Lead Engineers and other Specialists.

AXA Enterprise Project Analyst, AXA Tech (was Sun Life etc.), Global Rollout of EPM2003 from UK to USA, France, India and Australia

START Date
END Date

·Creation and Control of Project & Programme Plans (MSP Enterprise) from a Resource aspect.
·Liaison with Project Managers, Technical Leads and other Specialists.
·Administration of the MS Project 2003 Server and allied Systems (MSP, Sharepoint & PWA).
·Maintenance of the Enterprise Global Resource database.
·OLAP Cubes and Pivot Tables used for Reports and queries.
·Process Definition, Specification and Improvement.

Branch Planner, British Energy / Morson International, Gas Aux & Turbines

START Date
END Date

Branch Planner then Project Control Lead:
·Creation and Control of Project & Programme Plans (Primavera P3e) with EVA and MIS.
·Liaison with Workpack Managers, Engineering Leads and other Specialists.