Corporate Lead Planning Engineer, Salini Impregilo, Ghazi Barotha Hydropower Project, Karahnjukar Hydropower Project

START Date
END Date
Experience Hours (Planning & Scheduling)
15000
Experience Hours (Cost Management)
3000
Experience Hours (Forensic Analysis)
3000

Kárahnjukar Hydroelectric Project, Iceland 730 M long / 193 M high concrete faced, earth-filled dam (60 Km, 7.2m dia. tunnel (locomotive / TBM track, conveyor, utilities), shafts, power intake, gate chambers, pen-stock , Face Slab, Spillway, Toe-Wall and roads (excavation > 2.8 Million m3 and fill, 8.7 Million m3, concrete 178,000 m3), (Cost > 1 Billion $)

 

Ghazi Barotha Hydroelectric Project, Pakistan 52 Km long 100 m wide concreted power channel along with Service Road , utilities, Approach Roads, Bridges and Super-passages (Cost > 2.25 Billion US $)

Marcelino Braga

First Name
Marcelino
Last Name
Braga
Professional Since
Oldest experience
Years Experience
15
Guild Accreditation
GPC Member
LinkedIn Profile
https://www.linkedin.com/in/marcelino-braga-mba-pmp-pmi-sp-47014741?trk=nav_responsive_tab_profile

Planning and scheduling, cost estimating, earned value management, change management, cost controlling, risk management and forensic analysis.

Bids Cost estimator/planner, DACK Consulting, Second Avenue Subway

START Date
END Date
Experience Hours (Cost Management)
300

MEP and Architectural Oversight Estimator for Phase I of TBM and cut and cover subway project. I verified bid costs and change orders, as well as issued quartelry escalation reports to MTA.

Kenneth Floyd

First Name
Kenneth
Last Name
Floyd
Professional Since
Oldest experience
Years Experience
0
Guild Accreditation
GPC Member

1993

Program: P3 on DOS

Project:  Ingaborg-Nesbitt Urgent Care Clinic

Where:  Strand Streek, Fredericksted, St. Croix, USVI

1996

ATT Submarine Cable Co-location, Amplification and Termination(Fiber Optics

Program: P3

Location: West End, St. Croix, USVI

1998

Program: Suretrak

Project:  High Speed Chair Lift

Location: Northern New Mexico, US

2000

Project: Global Crossing intermediate station and co-location

Program: Primavera Contractor/P5

eugen stefan

First Name
eugen
Last Name
stefan
Professional Since
Oldest experience
Years Experience
46
LinkedIn Profile
https://www.linkedin.com/in/stefan-eugen-6a616266?trk=hp-identity-name

Planning Engineer

Planning Engineer, Techno Engineering & Associates, Marmaray CR-3 Project

START Date
Experience Hours (Planning & Scheduling)
1650

Planning Engineer Techno Engineering & Associates 

Updating programs of work for individual projects using Primavera P6;• Assisting in the preparation of Project Budget & Calculation of detailed man-hours, machine hours;• Resource Loading in Primavera P6 for individual Projects;• Preparation of project Cash flow;• Establishing the project Critical Path;• Preparation of man power Calculation & utilization schedule

Senior Planning Enginer, Techno Engineering & Associates, km 102+660 - km 133+660, Rehabilitation DN 76, Stei - Beius

START Date
Experience Hours (Planning & Scheduling)
4000
Experience Hours (Cost Management)
350
Experience Hours (Forensic Analysis)
4000

- Prepare baselines and revised programme of works;

- Reconstitute baselines;

- Monitor progress and produce look-ahead programmes and progress reports;

- Review and prepare Window Analysis and Time Impact Analysis;

- Provide support during the ascertainment of quantum related to delay analyses;

- Reviewing and editing risk event analyses and due diligence reports;

- Edit causation analyses forming part of claims’ reports;

- Prepare causation analyses forming part of claims’ reports;

Samer Othman

First Name
Samer
Last Name
Othman
Professional Since
Years Experience
0
Telephone Number
0097466075
LinkedIn Profile
https://www.linkedin.com/pub/samer-othman/19/731/278

Program Controls Manager, CH2M, Thames Tideway

START Date
END Date
Experience Hours (Planning & Scheduling)
3400
Experience Hours (Cost Management)
3400
Experience Hours (Forensic Analysis)
500

London Tideway Tunnels ProgramProgram Controls Manager

  • Overall responsibility for establishing systems for 12 year program for Schedule, Cost, Risk and Change Management from kick-off of the program.
  • In-depth work with two projects worth over £2bn from concept estimate (Thames Tunnel) to Design & Build Tender (Lee).
  • Development of processes, procedures and reporting, for program controls, whilst delivering immediate information on progress.